Hubble Space Telescope(HST) Archive System
NASA Langley Research Center | |||||||||||
|
Returned Hardware
Fuses
Astronaut Hoffman replacing the fuses in HST berthed in the payload bay.
There are three different fuse-module configurations (four each) in the HST Support system Module (SSM). The P-15 and P-16 fuses were replaced with upgraded versions. Four P-15 Modules (3 and 5 amp fuses) were replaced since one had opened, and the Rate Sensing Units (RSU) fuses were increased in size from three amps to five amps. Four P-16 modules (10 and 20 amp fuses) were replaced since their configuration was questionable. Spare P-17 and Optical Telescope Assembly (OTA) fuses were carried as contingency but were not replaced. The original plugs were returned for ground examination. The fuses were visually inspected and photographically documented before the DC milliohm and high-voltage tests occurred as part of the ground examination procedure. Resistance and current characterization tests were also part of the examination.
|
|||||||||||